Previous
Next
Haywards Pedestrian Bridge and Cycleway Fencing
This Project had four sections, the Pedestrian Bridge, Railway Ramp, Manor Park ramp and Stairs.
The balustrades and Stanchions manufactured in our workshop then Zinc Metal Sprayed and a three coat paint system applied at our coating workshop. The handrails were hot dipped galvanized and then a three coat paint system applied.
Provision was made in the metalwork for installation of LED lights and the fitting of wooden top rails.
To protect cyclists on the cycle way, Fencing was installed at any drop off point.
This involved two types of Fencing panels at 23 different sections of the cycle way.
SHARE THIS PROJECT